I went again for site meeting & inspection at the CPF Starfeedmills Company on 3rd Mar 2010. The construction phase already done and just some touch up works such as painting and fixing the defects on going at site. There is also a night visual test proposed by Ir. Liew to make sure the silo does not have any holes when handing over to the owner.
Some of electrical and mechanical works been discussed to get the finishing date for the people from Majlis Perbandaran Kajang(MPKJ) to come and inspect the site.There are also some defects highlighted for rectification purpose as below:-
1) Some of bolt hole miss location – To fix the bolt and make sure no miss out.
2) The top fin plate to top UB flange gap is larger than 6mm and in some area reached few inches. – To rectify this problem, Ir. Liew suggests adding steel plate on both side of the beam at the part it connecting to the column.
This is to stiffener the weak part as the big gap might bend the beam if there is any heavy load acting on it for example heavy machine.
The contractor also awarded (CPC) Certificate of Practical Completion by the owner dated 03rd May 2010 for insurance purpose for contractor. This is a certificate that will be awarded to the contractor upon job completion but the performance bond and the retention sum will be hold until the contractor finishes up all the remedial works.
Then, I went for a meeting at McD Sungai Besi, Kuala Lumpur on 5th may 2010. The purpose of this meeting is to discuss the roof plan that been design by Ir.liew for McD renovation project. After that, I attend another meeting at PK AGRO Company. This meeting is mainly about the variation orders claim by the electrical contractors. Meeting finished around 9.30pm.
On 6th May 2010, I went for a meeting with Koperasi Persatuan Guru-Guru Melayu Nusantara (KPGGM) at Sentul, Kuala Lumpur. This meeting is between the Jurutera Sinarunding, KPGGM and the Developer (SCH Brother). Meeting mainly focused on the land convergence discussion about the project land to the new owner, the process to start work at site and the approval from external department such as SYABAS, MAJLIS PERBANDARAN SELANGOR and many more.
Then, around 3.30pm, I went together with Engineer Lim to Majlis Perbandaran Nilai (MPN) to do the plan submission for the factory project (YOUNGREEM PROJECT) at Taman Tuanku Jaafar, Negeri Sembilan. The submission includes the plans for the Infrastructure, Building, Engineering, Environment, Waste Management, Landscape and etc.
On 7th May 2010, I went to Hulu Langat Site for site meeting and inspection. The previous visit to this site is on 16th April 2010. This meeting as per usual discussed the progress of works and problems encounter in construction stages.
ReplyDeleteHello Everybody,
My name is Ahmad Asnul Brunei, I contacted Mr Osman Loan Firm for a business loan amount of $250,000, Then i was told about the step of approving my requested loan amount, after taking the risk again because i was so much desperate of setting up a business to my greatest surprise, the loan amount was credited to my bank account within 24 banking hours without any stress of getting my loan. I was surprise because i was first fall a victim of scam! If you are interested of securing any loan amount & you are located in any country, I'll advise you can contact Mr Osman Loan Firm via email osmanloanserves@gmail.com
LOAN APPLICATION INFORMATION FORM
First name......
Middle name.....
2) Gender:.........
3) Loan Amount Needed:.........
4) Loan Duration:.........
5) Country:.........
6) Home Address:.........
7) Mobile Number:.........
8) Email address..........
9) Monthly Income:.....................
10) Occupation:...........................
11)Which site did you here about us.....................
Thanks and Best Regards.
Derek Email osmanloanserves@gmail.com