On 10 May 2010, Went for site meeting at Impact factory project at Bukit Lanchang, Petaling, Selangor. Firstly, I observe the BOMBA inspection and the way they inspect the fire fighting equipment at the factory. They checked the pump house, Bomba Hose reel pressure, the curtain wall at LV Consumer Switch Room, Control Room and HT Switch Room. For the HT Switch Room, in case of fire emergency, the CO2 gas will be release automatic after the sensor detects the smoke. For the other two rooms, the fire curtain will drop down to disallow the fire to spread into the room.
After the inspection, I attend the site meeting and this meeting mainly focused on the defects issued done by the contractor and the rectification status for updates. Some of rectification technique proposed by Ir.Liew to overcome the defects such as the roof cladding leaking, the joint of stainless steel plate not done neatly and etc.
On 12th May 2010, I attend a site meeting at PK AGRO Project. This meeting mainly focused about the progress of the project that involves main contractor and nominated sub contractor. Some of tests mainly urged by Ir.Liew for verification purpose such as blockage test, pressure test, injection test & etc. Then, I went for site inspection to observe the construction phase and the defects done by contractor. There is a slope failure done by the contractor because they excavate the soil without using the proper method such as sheet pile or open excavation.
On 14th May 2010, I went for a meeting at Chan Sow Lin, Kuala Lumpur. This meeting is to discuss and meet the contractor for the upcoming project at Jalan Tuanku Abdul Rahman, Kuala Lumpur. Some of additional & changes in the drawing explained to the contractor Mr. Patrick and many questions asked to the contractor regarding the project matters.
No comments:
Post a Comment